EA Networks – Solar Project

ElectraServe was proud to partner with EA Networks on the installation of a 75kW solar energy system at their Ashburton Business Estate headquarters. Spanning the rooftops of two buildings and comprising more than 140 solar panels, the project was completed in March 2024 and supports EA Networks’ commitment to sustainability and renewable energy.

Designed to reduce energy costs and generate clean, locally produced electricity, the system can produce up to 70kW of power during peak summer months, helping offset demand on the local electricity network. By generating energy on-site during daylight hours, the installation provides an efficient and practical solution for a business with significant daytime energy consumption.

As the lead contractor, ElectraServe managed the design and installation of the solar array, ensuring a solution tailored to EA Networks’ operational needs. The project demonstrates the strong business case for commercial solar and highlights how local organisations can take meaningful steps towards a more sustainable energy future.

Project Details

  • Client: EA Networks
  • Location: Ashburton Business Estate
  • System Size: 75kW
  • Panels Installed: 140+
  • Services: Solar Design & Installation
  • Completed: March 2024